Stud Handling

TENSOR STUD HANDLING EQUIPMENT

Bolt Tensioning     RVH Tensioning Systems     Single Stud tensioner     Multi Stud tensioner

Stud and Nut runner

  • Light design to make it easier to thread or un-thread the bolts from the flange
  • Balancing device for smooth handling and easier operation

           

Lifting Beam

  • Designed to handle 8 studs
  • Balancing device for each stud to minimize handling damages

Stud Rack

  • Holds up to 16 sets of studs and nuts
  • Designed to be handled with a forklift
  • The frame is made of stainless steel with plastic bolt holes for protection

Operation

  • The stud rack is placed on the refueling floor or in the cavity
  • The studs are lifted directly from the bolt cradle and placed in the stud rack
  • Each stud has a quick and easy connection/disconnection to the lifting beam

Bolt Tensioning     RVH Tensioning Systems     Single Stud tensioner     Multi Stud tensioner

Contact us for more info